CONNECTIVITY

Dholera SIR Connectivity

RAIL

  • MRTS is planned which will connect DSIR with Ahmedabad
  • Dedicated Freight Corridor (DFC) is 1.5 hours from DSIR
  • Dholera Railway Station proposed in DSIR

ROAD

  • Currently, two lane State Highway being expanded to 4 lanes
  • A dedicated 6 lane access controlled expressway connecting Ahmedabad & Dholera is proposed and design work has been completed for the same

AIR

  • Proposed Dholera International Airport will be located in close proximity to the Northern boundary of DSIR
  • Environment Clearance from MoEF and site clearance from MoCA have been obtained for developing an International Airport at Dholera
  • Bhavnagar Domestic Airport and Ahmedabad International Airport are 2 hours from DSIR

SEA

  • Pipavav is the closest port to DSIR, which is approximately 200 km away
  • Pipavav has a range of cargo handling capabilities such as Container, Bulk, Capital Goods, Liquid, Gas, etc.
  • DSIR is also well connected to the major ports of Mundra and Kandla

RAIL CONNECTIVITY

  • Pipavav is the closest port to DSIR, which is approximately 200 km away
  • Pipavav has a range of cargo handling capabilities such as Container, Bulk, Capital Goods, Liquid, Gas, etc.
  • DSIR is also well connected to the major ports of Mundra and Kandla

RAIL

  • Pipavav is the closest port to DSIR, which is approximately 200 km away
  • Pipavav has a range of cargo handling capabilities such as Container, Bulk, Capital Goods, Liquid, Gas, etc.
  • DSIR is also well connected to the major ports of Mundra and Kandla

  • Roads and services/utilities
  • Raw water transmission line from source
  • Wastewater treatment and recycle
  • Solid waste management
  • Power T&D network
  • Information Communication Technology (ICT) network
  • Administrative and Business Centre of Dholera (ABCD)

  • River bunding for flood management
  • Ahmedabad – Dholera Expressway
  • Ahmedabad – Dholera MRTS
  • Freight rail from DSIR to Bhimnath for connection to DFC
  • Dholera International Airport

  • Self-governed economic region enjoying full support of the government and full potential for private sector participation.
  • Dholera City Logistic support of the Delhi-Mumbai Dedicated Freight Corridor linked with efficient rail and road network.
  • Dholera City to be linked with Ahmedabad city with metro rail system.
  • Dholera City Proximity to sea port, Closeness to international airport.
  • Dholera City Premium civic amenities.
  • Dholera City Close to Gujarat International Finance City (GIFT).
  • Dholera City Close to Petro-chemicals and Petroleum Inv. Region (PCPIR).
  • Dholera City Autonomy in operations.
  • Dholera City Flexibility in decisions.
  • Dholera City Single window clearance.
  • Dholera City Dispute Resolution mechanism.

  • Pre-feasibility study completed by M/s feedback ventures.
  • Location identification along with details of the area.
  • The work on the central spine road has already started
  • Notification issued for delineation of 879 sq. kms of area as DSIR.
  • Government has allocated 1700 hectare land for adjoining airport.

  • AECOM awarded $30 million USD program management contract for Delhi Mumbai Industrial Corridor in Gujarat.
  • Programme managers for new cities (PMNC) may be taken up simultaneously. RFP for selection of PMNC has been issued to the seven empaneled consultants and letter of award and work order issued by DMICDC to the consortium of M/s AECOM Asia Company Ltd.
  • Dholera to soon host one of country’s four smart cities.
  • Rapid transit systems to connect Ahmedabad and Dholera.
  • Development of New Greenfield International Airport at Dholera (Gujarat) e-tender was closed on 12-Aug-2013
  • IBM to help transform Delhi-Mumbai Industrial Corridor with creating smarter and sustainable cities like Dholera SIR.
  • Integrated multimodal logistics hub in Haryana and construction of new railway line from Bhimnath to Dholera.
  • The final development plan for Dholera Special Investment Region (DSIR) and final pre-feasibility studies have been completed. The final pre-feasibility studies for renewable energy, integrated housing for industrial workers, flood management for Phase 1 development of DSIR, railway infrastructure at DSIR and water management system for Phase 1 development of DSIR have been completed.
  • Government of Gujarat has transferred 70,430 acres of land to RDA (Regional Development Authority).
  • On similar lines, the RFP document for Town Planning-2 (West) had been issued and the evaluation of bids has been completed and letter of award will be issued to the consultant shortly.